Concept of the Logo: The logo is symbolic of various facets of the environment. The circular Form conveys its universal quality. The numerous vertical lines emphasize the multi-dimensional character of the problems of environmental planning and coordination.The four horizontal strata are indicative of the main resource groups: terrestrial, aquatic, biotic and solar. The graded vertical ascending strips suggest the yearning of man for a better life in a cleaner environment.
   
Bhoj Wetland Project > Catchment Area Treatment
 
Bhoj Wetland Project
 
About the Lakes
Issues
Problems Confronting the Lakes
About the Project
Objectives of the Project
Approach
Water Quality Monitoring Report
 
Sub Projects
Desilting & Dredging
Deepening & Widening of Spill Channel
Restoration of Takia Island
Afforestation
Catchment Area Treatment
Prevention of Pollution (Sewerage)
Solid Waste Management
Link Road from Retghat to Lalghati
Prevention of Pollution from Dhobighats
Biological Control through Aquaculture
Deweeding
Installation of Floating Fountains
Water Quality Monitoring
Awareness & Public Participation
Lake View Promenade
Arched wall around Lower Lake
Protection of Fringe Area
Interpretation Center
Lake Conservation Authority
Right to Information Act 2005
 


Construction of Check dams, silt traps, toe walls and cascading for controlling silt entry

The aim of the catchment area treatment of the lakes is to mitigate inflow, ofsilt,agricultural residues and other wastes etc. into the lake through inlet channels discharging into the lake. This has been achieved by constructing gabion structures, check dams silt traps and toe walls on all the inlets channels leading to the Upper & Lower lake. Under this sub-project at 3 Nallas (Banganga, Hindi Granth Academy & MVM) into the catchment area of lower lake and 12 Nallas (Halallpura, Laukhedi, Bairagarh Kalan, Bhainsakhedi, Intkhedi, Sirsa Nala, Mugaliya Chhap, Gora nala, Kotra Sultanabad, SAF Nalla, Bhauri & Jamunia Chhir Nala) into the catchment area of Upper lake, a total number of 75 check dams, high level gabion structure, low level gabion structure and 2 silt traps has been executed. The details of the structures constructed have been tabulated as below:-

S.No Name of the Nalla/Drain No. of Structure Catchment Area (in Hect.) Silt kept by Strctures (in Cum)
1 Halalpura Nallah  1080  470 
2 Laukheri Nalla  110  120 
3 Bairagarh Kala  530  195 
4 Bhaisakhedi Nalla  1189  546 
5 Intkhedi Nalla  36  1786  3963
6 Sirsa Nalla  313  20 
7 Mugalia Chhap  16  11408  3706 
8 Gora Nalla  383   275
9 Kotra Sultanabad  1   306  650
10 S.A.F. Nalla   325  205
11 Bhouri Catchment Area  100   95
12 Jamunia Cheer Catchment Area  300   68
13 Prempura Catchment Area  350  200 
14 Mundla Nalla  2   6000  200
15 Kolans Nalla  15850  --

 

   
 