Concept of the Logo: The logo is symbolic of various facets of the environment. The circular Form conveys its universal quality. The numerous vertical lines emphasize the multi-dimensional character of the problems of environmental planning and coordination.The four horizontal strata are indicative of the main resource groups: terrestrial, aquatic, biotic and solar. The graded vertical ascending strips suggest the yearning of man for a better life in a cleaner environment.
   
Bhoj Wetland Project >Prevention of Pollution from Dhobighats
 
Bhoj Wetland Project
 
About the Lakes
Issues
Problems Confronting the Lakes
About the Project
Objectives of the Project
Approach
Water Quality Monitoring Report
 
Sub Projects
Desilting & Dredging
Deepening & Widening of Spill Channel
Restoration of Takia Island
Afforestation
Catchment Area Treatment
Prevention of Pollution (Sewerage)
Solid Waste Management
Link Road from Retghat to Lalghati
Prevention of Pollution from Dhobighats
Biological Control through Aquaculture
Deweeding
Installation of Floating Fountains
Water Quality Monitoring
Awareness & Public Participation
Lake View Promenade
Arched wall around Lower Lake
Protection of Fringe Area
Interpretation Center
Lake Conservation Authority
Right to Information Act 2005
 

Prevention of Pollution from Dhobighat

This sub-project at Lower lake incorporate the work of shifting of washing bay from the existing location as well as slums from the banks of Lower lake and development of land so vacated. Presently the washermen settlements are concentrated near Kilol park, Gokhale hostel & SBI training centre Khatlapura. High quantity of wastes specially detergents, chemicals and furnace ashes enter into lower lake daily due to the washing activities at washing bay. To prevent the degradation of lower lake it is necessary to remove the washing bay along with settlement from the shoreline of the lower lake. Attempts are being made to motivate the washermen community for voluntary shifting. The site for shifting has been selected and it is situated on the down streamside of lake a nallah named Patra is flowing with sufficient open spaces of lands along its banks. To accommodate the washermen, infrastructure facilities for the colony like construction of roads, water supply system, sewerage system, street lighting etc. will be provided. Total 10.50 acres, land has been made available at Roshanbagh and Kewdawallah bagh near Patra nallah for new washer bay relocation. Preparatory work has already been done in Kewdawala Bagh for rehabilitation of washermen in first phase. In Second phase 90% work of construction of washing bay, foot bridge, development of plots and laying of pipelines at Roshanbagh and Kewdawallahbagh has already been completed while the construction of overhead tank and rufning filter are ikely to be completed by May 2002. The washerman from existing washing bay shall be rehabilitated soon to new sites and the process of shifting the same is in progress.

 
   
Photo Gallery Contact Us Bhoj Wetland Project
Right to Information Rules & Regulation  
 